Metro-North Bridgeport Railroad Station Platform Upgrades









PROJECT
Upgrades and modernizations to Bridgeport Station’s high-level platforms for ConnDOT.
PROGRAM
Platform upgrades include but are not limited to:
- New steel canopies with LED lighting; glass and metal windscreen panels incorporating advertisement panels
- Renovated platform walking surface with new tactile warning strip
- New MetroNorth wayfinding and variable messaging signage
- New passenger benches and waste receptacles
PROJECT DURATION
Spring 2013 - Winter 2017
PROJECT COST
$7 Million
PROJECT TEAM
Engineers: Lochner Engineering
General Contractors: Banton Construction
GWG Architects served as Architectural Consultant to Lochner Engineering
Typology | Transportation |
Location | Bridgeport, CT |